• AECOM Tideway Tunnels

    AECOM

    Tideway Tunnels C410 Central Contract

    London, United Kingdom

Project Summary


Project
London’s sewerage system urgently required upgrades given the increase in the city’s population and production of waste. Millions of tons of sewage spill into the River Thames’ tidal section annually, with even slight rainfall triggering these sewage discharge events. The GBP 4 million Thames Tideway Tunnel project was developed to reduce the approximately 50 spillage events each year taking place along the river to four per year. The Tideway project is divided into three contracts: east, central, and west. AECOM is the main designer on the central contract, which covers about 25 kilometers of tunnels and connecting tunnels between the towns of Acton and Abbey Mills in London.

Solution
AECOM created a new profile to the river walls, and solved design issues where large gas mains were present close to the existing walls. Gas service, as well as shipping services, had to be protected during construction and after the project’s completion. To collaborate and keep everyone on the project informed AECOM used Bentley applications to design the central contract tunnels and map out construction plans. Bentley’s ProjectWise hosted the project and facilitated access to data for all stakeholders for all eight sites. It also housed all construction models and drawings to simplify the handover process.

Outcome
Data for both temporary and permanent works were accessible to all project stakeholders, no matter their location, for easier decision making. Currently, there are more than 1,100 users in the ProjectWise system, including more than 40 stakeholders. As of October 2018, there were over 190,000 documents created in the central repository, with over 4,500 drawings and 1,500 models. These users share information through defined workflows between all participants with access to the data 24/7 every day of the year. ProjectWise took what would have been a logistical nightmare, filled with document control and version issues, and remedied the issue, while also reducing labor management costs. Currently in the construction phase, the central contract of the Tideway project is on schedule to be completed in 2022.

Software
ProjectWise was used to create a controlled and secure environment for all assets, using workflows, defined document coding, and managed workspaces.
OpenBuildings Designer (formerly AECOsim Building Designer) and MicroStation were used to create a master design model for each site in the project. OpenBuildings Designer also helped with the health and safety of the project. The team used the application for pre-construction work, allowing the design team to view all areas of the facility. This practice ensured that maintenance workers would always be visible during their inspections, improving safety on the site. Navigator’s clash detection capabilities also helped with project safety, allowing the design and modeling teams to fix any clashes before construction to streamline the project timeline. ContextCapture produced test models of specific sites, using point cloud data and simple camera shots along the shore.

Project Playbook: OpenBuildings Designer, ContextCapture, Descartes, gINT, MicroStation, Navigator, ProjectWise
Outcome/Facts
  • The Thames Tideway Tunnel project was developed under an European Union directive to reduce sewage discharge events.
  • There are more than 1,100 users in the ProjectWise system, including more than 40 stakeholders.
  • As of October 2018, there were over 190,000 documents created in the central repository, with over 4,500 drawings and 1,500 models.
Quote:
  • “Bentley’s ProjectWise provided the controlled environment in which to build a virtual representation of the assets of eight individual sites, comprising multiple disciplines. We could produce more than 140,000 documents from more than 40 stakeholders, consisting of more than 1,000 users in a coordinated fashion through the design phase and into construction and as-constructed in preparation for a hand back to the client.”

    Barry Jones Associate Director – BIM Manager AECOM